Weekly Production Performance Summary

Track and analyze key manufacturing performance metrics including production volume, quality, efficiency, and downtime to optimize operational effectiveness and maintain production targets.

Report Objective

Monitor weekly manufacturing performance metrics to ensure production targets are met while maintaining quality standards and operational efficiency. This report helps identify trends, bottlenecks, and improvement opportunities in the electronic equipment manufacturing process.

Production Output and Efficiency

Line chart showing weekly production volume trends with OEE overlay

Questions to Consider:

Dec 2024Jan 2025Feb 2025week_date9,80010,00010,20010,40010,600units_producedunits_producedWeekly Production Volume TrendProduction output shows week-over-week variations with recent upward trend
  • What is the week-over-week change in production volume?

  • How does current production compare to capacity?

  • Are there any seasonal patterns in production output?

  • What factors are driving OEE variations?

  • How does current OEE compare to industry benchmarks?

  • Are there specific lines or shifts with lower efficiency?

Dec 2024Jan 2025Feb 2025week_date8400.0%8600.0%8800.0%oee_percentageoee_percentageOverall Equipment Effectiveness (OEE) TrendOEE fluctuates between 75-92% with recent improvement

Quality Performance

Bar chart displaying weekly defect rates

Questions to Consider:

Dec 2024Jan 2025Feb 2025week_date0.0%50.0%100.0%150.0%200.0%defect_ratedefect_rateWeekly Defect Rate AnalysisQuality metrics show improvement with defect rate below 2%
  • What is driving changes in defect rates?

  • How do defect rates vary by product type?

  • What quality improvement initiatives are showing results?

Downtime Analysis

Bar chart showing downtime by category

Questions to Consider:

  • Which downtime categories show concerning trends?

  • How effective are current maintenance schedules?

  • What opportunities exist for reducing unplanned downtime?

Equipment FailurePlanned MaintenanceMaterial ShortageSetup/Changeoverdowntime_reason0.020.040.060.080.0100.0sum(downtime_hours)Equipment FailurePlanned MaintenanceMaterial ShortageSetup/ChangeoverProduction Downtime by CategoryEquipment failure and maintenance are primary downtime drivers